Survey and Construction 2011-2018,
Provision of Erosion Control and River Crossing Survey Services on ROW on BTC/SCP and WREP.
Pipeline erosion control activities has been carried out within the areas of BTC/SCP and WREP pipelines corridors, passing in Georgia, on various sections. On 2011-2014, previously mentioned activities were conducted through Georgia on 88 sections.
As per years, among them:
On 2011, activities on BTC/SCP pipeline was held on 11 sections and on WREP –on 20 sections;
On 2012, activities on BTC/SCP pipeline was held on 10 sections and on WREP –on 22 sections;
On 2013, activities on BTC/SCP pipeline was held on 6 sections and on WREP –on 17 sections;
On 2014, activities on BTC/SCP pipeline was held on 2 sections.
In 2011 - 2018 Annual survey works have been conducted on crossings of following rivers:
Rivers: Satskhenisi (kp 37+504), Norio 1 (kp 43+093), Norio 2 (kp 44+021), Gldanula (kp 61+025), Narekvavi (kp 79+337), Ksani (kp 99+624), Aragvi (kp 73+366), Lekhura (kp 108+431), Tortla 1 (kp 114+843), Tortla 2 (kp 129+773), Beukchay (kp116+331), Chilchili (kp 120+820), Gumbati 1 (kp 136+664), Gumbati 2 (kp 136+882), Mejuda (kp 136+866), Liakhvi (kp 141+626), East Frone (kp 158+998), West Frone (kp 168+001), Cheratkhevi (kp 188+927), Algeti (kp 53+620), Chivchavi (kp 84+845), Ktsia (kp 138+636), Kura West (kp 222+084), Potskovi 1 (kp 239+096), Potskovi 2 (kp 243+866), Dzirula (kp 201+613), Dumala (kp 216+177), Kvirila 1 (kp 243+919), Narula (kp 246+827), Buja (kp 252+063), Cholaburi (kp 261+ 534), Kvirila 2 (kp 264+733), Khanistskali (kp 281+830), Banuri (kp 284+473), Kvintskali (kp 294+067), Sulori (kp 304+247), Kumuri (kp 308+978), Tkhilnara (kp 321+820), Aliskhevi (kp 41+630), Dzusa (kp 254+100), Khevistskali (kp 327+092), Supsa Import (kp 372+344), Supsa Export (kp 0+100).
Survey works also have been conducted on Tank C, Supsa.