img

Design 2019,

1. Preparation of design-cost estimation documentation for arrangement of drainage channel (L= 232.69m) from Tamarashvili street to river Fotskhovi at Akhaltsikhe;

2. Preparation of design cost-estimation documentation for rehabilitation of so called  “Mlashikhevi” drainage channel (From David and Konstantin street to Gvaramadze street, L=108, 25 m)  at Akhaltsikhe;

3. Preparation of design cost-estimation documentation for right bank protection facility reconstruction works  on river Fotskhovi at Akhaltsikhe municipality;

4. Preparation of design cost-estimation documentation for arrangement of  left bank protection facility  on river Fotskhovi, next to village Skhvilisi , at Akhaltsikhe municipality;