Design 2019,
1. Preparation of design-cost estimation documentation for arrangement of drainage channel (L= 232.69m) from Tamarashvili street to river Fotskhovi at Akhaltsikhe;
2. Preparation of design cost-estimation documentation for rehabilitation of so called “Mlashikhevi” drainage channel (From David and Konstantin street to Gvaramadze street, L=108, 25 m) at Akhaltsikhe;
3. Preparation of design cost-estimation documentation for right bank protection facility reconstruction works on river Fotskhovi at Akhaltsikhe municipality;
4. Preparation of design cost-estimation documentation for arrangement of left bank protection facility on river Fotskhovi, next to village Skhvilisi , at Akhaltsikhe municipality;