img

Design 2020,

1. Preparation of necessary design-cost estimation documentation for rehabilitation of Tabidze street in Akhaltsikhe;

2. Preparation of necessary design-cost estimation documentation for  culvert (Section 4x2.5 m, L=15.09m) construction   at Kazbegi street in Akhaltsikhe;

3. Preparation of necessary design-cost estimation documentation for rehabilitation  of Kazbegi street (L=0.473 km) in Akhaltsikhe;

4. Preparation of necessary design-cost estimation documentation for construction of  Maradachai  drainage channel (L=121.73m);

5. Preparation of necessary design-cost estimation documentation for rehabilitation of access road and yard to “Didimamishvili N 2” in Akhaltsikhe;

6. Preparation of necessary design-cost estimation documentation for rehabilitation of access road  to “Rustaveli street N 125 “ in Akhaltsikhe;

7. Preparation of necessary design-cost estimation documentation for rehabilitation access road   to Public school N 2 in Akhaltsikhe and existing deadlock on right side of Aspindza street in Akhaltsikhe;

8. Preparation of necessary design-cost estimation documentation for rehabilitation of “Tsikhisdziri street deadlock”  in Rabat settlement in  Akhaltsikhe;

9. Preparation of necessary design-cost estimation documentation for rehabilitation of Mikutishvili street in Akhaltsikhe;

10. Preparation of necessary design-cost estimation documentation for construction of reinforcement-concrete wall on kp 3+73 –kp 3+88 on Mikutishvili street in Akhaltsikhe;

11. Preparation of necessary design-cost estimation documentation for construction of  park space on Mikutishvili street in Akhaltsikhe;

12. Preparation of necessary design-cost estimation documentation for rehabilitation of  road (L=2.1km)  in village Tiseli, Akhaltsikhe municipality.